Preparation for W4M

Only 5 days left to prep for the W4M special invent station. The recon is complete – I’m moving off the moat down to the Irwin Battery. The upper battery puts me at almost the same height of the Old Point Comfort Lighthouse. And the view is fantastic.

What’s left to do:
(1) Complete support pole for G5RV feed point
(2) Prep supports for the G5RV ends
(3) Get a pop-up shelter for the operations table
(4) Fix dipole vertical
– re-solder connection to base
– strengthen pole support
(5) Update USAARS website
(6) Create special event operator script
(7) Prep log books